- Novo
Cooling tunnel GSL.03.A80
Contract price
Cooling tunnel GSL.03.A80 is designed to cool down the curd bar before glazing process or after glazing – in order to fix the shape of glazed curd bar.
UPC:
EAN13:
Novo produto
Descrição
Cooling tunnel GSL.03.A80 is designed to cool down the curd bar before glazing process or after glazing – in order to fix the shape of glazed curd bar. The length of the cooling tunnel may vary, according to the specification of the used glaze for coating. The cooling equipment is a part of glazed curd bars production line GSL.
Main advantages:
- with automatic belt corecting device;
- with automatic defrost of evaporator;
- with plexiglass covers.
Technical data:
- the movement speed of the belt – 2…4 m/min;
- belt width – 450 mm;
- the inside temperature – up to -16 °C;
73 outros produtos na mesma categoria:
- Novo
Cooling Drum for Sugarless Candy
- Novo
Vertical Cylindrical Tanks For Milk Cooling 100-2000 Lt.
- Novo
The Serap milk cooling tank Model First.SE
- Novo
Tanks with insulated spiral cooling jacket on legs
- Novo
Twist Spiral Pasteurizer & Cooler by WATER
- Novo
Thermal treatment system for products: cooler
- Novo
Spiroaertex (packaged and unpackaged food)
- Novo
All-in-one cooling systems with a hermetic compressor rma
- Novo
Belt blancher-cooler BR33/BR40/BR50/BR51/BR52
English
Deutsch
Français
Español
Italiano
Português PT